skip to Main Content

When is a Post Construction Stormwater Management Plan (PCSMP) Required?

A PCSMP is required when a project disturbs an area greater than 5,000 square feet.  The exception to this requirement is if the project involves maintenance of a parking area with no change to the hydraulic grade.

This Post Has 0 Comments

Comment on this FAQ

Your email address will not be published. Required fields are marked *

Back To Top