- Stage 1
- Site Inspections must be performed as follows:
- within 24 hours of a storm event equal to or greater than 0.5 inches
- within 9 days of the last site inspection conducted
- The Reporting Period ending dates correspond to the following:
- each Saturday of each month
- Sites meeting the following condition must adhere to stage 1 site inspection and reporting requirements:
- All sites not qualifying for stage 2, 3, or 4 inspection requirements.
- Site Inspections must be performed as follows:
- Stage 2
- Site Inspections must be performed as follows:
- within 24 hours of a storm event equal to or greater than 0.5 inches and
- within 19 days of the last site inspection conducted.
- The Reporting Period ending dates correspond to the following:
- the second Saturday of each month and
- the fourth Saturday of each month.
- Sites meeting all of the following conditions can adhere to stage 2 site inspection and reporting requirements:
- All sedimentation and erosion control measures have been installed and functioning correctly.
- All inspection reports are up to date and accurate.
- All site grading has been completed in accordance with the SWPPP (note: minimal utility and/or building pad excavation may be conducted).
- Vegetative ground cover has been fully established.
- The CITY OF OMAHA Inspector assigned to the site has allowed the transition to Stage 2 site inspection and reporting requirements.
- Site Inspections must be performed as follows:
- Stage 3
- Site Inspections must be performed as follows:
- within 24 hours of a storm event equal to or greater than 0.5 inches and
- within 38 days of the last site inspection conducted.
- The Reporting Period ending dates correspond to the following:
- the second Saturday of each month.
- Sites meeting all of the following conditions can adhere to stage 3 site inspection and reporting requirements:
- Items 2.c.i thru 2.c.iv. are in compliance.
- All public Improvements have been installed.
- The CITY OF OMAHA Inspector assigned to the site has allowed the transition to Stage 3 site inspection and reporting requirements.
- Site Inspections must be performed as follows:
- Stage 4 (note: also referred to as winter stage)
- Site Inspections must be performed as follows:
- within 24 hours of a storm event equal to or greater than 0.5 inch and
- within 38 days of the last site inspection conducted.
- The Reporting Period ending dates correspond to the following:
- the second Saturday of each month.
- Stage 4 inspecting and reporting requirements shall only be applicable during December 1 through March 1. After March 1 site inspection and reporting requirements shall revert to the applicable requirements in use prior to December 1.
- Sites meeting all of the following conditions can adhere to stage 4 site inspection and reporting requirements:
- Items 2.c.i thru 2.c.iv. are in compliance.
- The request has been submitted before December 1
- Runoff is unlikely due to winter conditions (e.g., site must be covered with snow, ice, or the ground is frozen)
- The CITY OF OMAHA Inspector assigned to the site has allowed the transition to Stage 4 site inspection and reporting requirements
- Site Inspections must be performed as follows: